Zinc work
in Sint-Pieters-Leeuw
Open exposure to the west wind wears the verges and regularly tears off badly bedded ridge tiles. That is why zinc work comes back so often in our schedule in Sint-Pieters-Leeuw.

The context in Sint-Pieters-Leeuw
Why here in particular
What changes in Sint-Pieters-Leeuw is the context: brick terraced houses, Pajottenland farms, estates from the 1980s. Open exposure to the west wind wears the verges and regularly tears off badly bedded ridge tiles.
Zinc lasts fifty years, the soldered joints far less once they start moving. A tired roof valley or a lifted flashing lets water through exactly where you cannot see it from the ground.
- Quote
- Priced after a site visit, free of charge and with no obligation.
- Duration
- 1 to 2 days for a targeted job.
- Call-out
- Included in Sint-Pieters-Leeuw and neighbouring municipalities
How it runs
How the job runs
The same protocol everywhere, adapted to what the visit reveals on site. Nothing is decided from the pavement.
- Survey and photos of the existing situation
- Made-to-measure fabrication
- Zinc, copper or aluminium depending on the substrate
- Fitted with expansion joints
- Tin soldering
- Water test before handover
Survey
Condition of the roof valleys, ridges, flashings, fascias and downpipes. With photos to back it up.
Forming
Pieces folded to measure: standard lengths almost never fit a Belgian building.
Targeted removal
The affected area removed without dismantling all of roof covering.
Installation
Fixed on brackets, expansion allowed for, overlaps running with the water.
Soldering and testing
Tin soldering, water test to check before closing it back up.
Frequently asked questions
Zinc work in Sint-Pieters-Leeuw
The questions we get asked most often before this kind of job.
New zinc clashes with the old, doesn’t it?
At first yes, for a few months. It weathers in and the difference is gone within a year or two.
Do you do underground downpipes?
The connection as far as the inspection chamber, yes. Beyond that it becomes groundworks and we point you elsewhere.
Zinc, copper or PVC?
Zinc for the life-to-price ratio, copper for longevity and looks, PVC when the budget decides. We never let copper and zinc touch: that is corrosion guaranteed.
Do you come out to Sint-Pieters-Leeuw with no extra call-out charge?
Yes. Sint-Pieters-Leeuw is one of our 17 municipalities: the call-out is included in the quote, not added at the bottom of the invoice.
Other work in Sint-Pieters-Leeuw
While we are on site
Combining two jobs in one visit brings the invoice down. We suggest it when it makes sense, never to pad the quote.
Zinc work in the neighbouring municipalities
All our work in Sint-Pieters-Leeuw · Everything about zinc work
Zinc work in Sint-Pieters-Leeuw: let’s talk about it
On-site visit, detailed costing within 48 working hours, with no obligation on your part.