
Zinc work
in Grez-Doiceau
A rural municipality in the Train valley, Grez-Doiceau keeps a scattered pattern of hamlets, square farmsteads and recent builds. Fascias, roof valleys, flashings, downpipes and cladding: everything that carries the water away and protects the roof’s weak points.

The context in Grez-Doiceau
Why here in particular
A rural municipality in the Train valley, Grez-Doiceau keeps a scattered pattern of housing between hamlets, square farmsteads and recent builds. In practice, large converted farm volumes pile up long roof valleys, endless fascias and old roof timbers that have rarely been treated.
Zinc lasts fifty years, the soldered joints far less once they start moving. A tired roof valley or a lifted flashing lets water through exactly where you cannot see it from the ground.
- Quote
- Priced after a site visit, free of charge and with no obligation.
- Duration
- 1 to 2 days for a targeted job.
- Call-out
- Included in Grez-Doiceau and neighbouring municipalities
How it runs
How the job runs
The same protocol everywhere, adapted to what the visit reveals on site. Nothing is decided from the pavement.
- Survey and photos of the existing situation
- Made-to-measure fabrication
- Zinc, copper or aluminium depending on the substrate
- Fitted with expansion joints
- Tin soldering
- Water test before handover
Survey
Condition of the roof valleys, ridges, flashings, fascias and downpipes. With photos to back it up.
Forming
Pieces folded to measure: standard lengths almost never fit a Belgian building.
Targeted removal
The affected area removed without dismantling all of roof covering.
Installation
Fixed on brackets, expansion allowed for, overlaps running with the water.
Soldering and testing
Tin soldering, water test to check before closing it back up.
Frequently asked questions
Zinc work in Grez-Doiceau
The questions we get asked most often before this kind of job.
Is scaffolding needed?
For a complete fascia yes, for a one-off flashing no. It is priced separately and stated up front.
New zinc clashes with the old, doesn’t it?
At first yes, for a few months. It weathers in and the difference is gone within a year or two.
Do you do underground downpipes?
The connection as far as the inspection chamber, yes. Beyond that it becomes groundworks and we point you elsewhere.
Do you come out to Grez-Doiceau with no extra call-out charge?
Yes. Grez-Doiceau is one of our 17 municipalities: the call-out is included in the quote, not added at the bottom of the invoice.
Other work in Grez-Doiceau
While we are on site
Combining two jobs in one visit brings the invoice down. We suggest it when it makes sense, never to pad the quote.
Zinc work in the neighbouring municipalities
A quote for zinc work in Grez-Doiceau?
On-site visit, detailed costing within 48 working hours, with no obligation on your part.
